HomeWho we serveTradesStructural steel

Trade · Structural Steel · CSI Division 05

Tonnage and piece counts that match the erection sequence.

Structural steel takeoff totals tonnage by member size and grade, counts pieces (beams, columns, braces) individually because each is a discrete fabricated item, and quantifies connections separately — and the member sizes needed to compute weight are almost always in a framing schedule, not printed on the member itself.

View up through red structural steel framingT-03 · Structural steel
Drawing reading

The drawing-reading problem: the framing plan shows position, the schedule shows size

A structural framing plan draws each beam, column and brace as a line or symbol at its correct position, typically tagged with a mark number (e.g. a “W12” tag or grid-based piece mark) rather than a full size callout printed at every occurrence. The actual section size, grade and length come from a member schedule or a separate elevation/section sheet, so converting the framing plan into tonnage means matching every plan mark to its schedule row correctly — on a multi-story building, the same mark number can repeat on different framing plans with different sizes if the schedule is level-specific.

Connection design is often deferred to the fabricator with only a connection type or capacity noted on the drawing, so quantifying connections (bolts, plates, welds) at takeoff stage means working from the general notes and typical details rather than a fully dimensioned connection at every joint.

Objects + units

What gets measured, and in what unit

Six object classes cover a typical structural steel package. Each keeps its own unit instead of being folded into a single blended quantity.

Takeoff objectUnitHow PiloBuild resolves it
Structural membersTON (weight), EA (piece count)Section size and grade from the level-specific member schedule, matched by piece mark.
Piece lengthLF, per memberComputed from vector geometry between resolved connection points.
ConnectionsEA, by connection typeBolted, welded and moment connections counted from general notes and typical details.
DeckingSF, by gauge and profileMetal deck area by level, matched to the deck schedule or plan note.
Miscellaneous & ornamental steelLB or EAStairs, railings and embeds counted separately from primary framing tonnage.
FireproofingSF, by member type and ratingApplied per the fire-rating schedule, not a flat coefficient on total tonnage.
Resolution

Classification, resolved before the quantity is produced

Every framing member is resolved to its piece mark and matched against the level-specific member schedule, so section size and grade are pulled from the schedule row that actually applies to that member on that framing plan, not a mark number that happens to repeat elsewhere in the set. Piece length is computed from the vector geometry between connection points, and tonnage is built up per piece from resolved section, grade and length rather than a blended average weight per square foot.

Where a design-intent structural drawing and a fabricator’s shop/erection drawing takeoff diverge on a member size or connection type, the BOM cross-check reports it before fabrication, which is the point in a steel package where a discrepancy is cheapest to fix.

Output

What you get back on a structural steel package

Quantities by class

Every structural steel object above, grouped the way your estimating desk already groups it, with the unit that matches how it is bought.

A geometry audit trail

Each quantity links back to the sheet, the resolved callout or schedule row, and the scale a person confirmed.

A BOM cross-check

Design-intent drawings compared against a subcontractor shop-drawing takeoff on the same scope, with discrepancies listed before they reach the field.

Review

3 questions, specific to structural steel

What CSI division does Structural Steel takeoff fall under?

Primarily CSI Division 05 (Metals). Related sections we classify against on a typical structural steel package include: 05 12 00 Structural Steel Framing, 05 21 00 Steel Joist Framing, 05 31 00 Steel Decking.

Does PiloBuild replace our estimator on this trade?

No. PiloBuild produces the measured quantities, grouped and classified the way this page describes, and a bid summary showing the arithmetic behind the cost build-up. Your estimator applies judgment, reviews the classification, and owns the number that goes on the bid. The scale confirmation and the review-and-approve gate exist specifically so a person checks the machine, not the other way around.

What happens when the drawing set is incomplete or the schedule is missing?

Where a callout cannot be resolved — a wall-type tag that does not match any schedule row, a size annotation with no nearby segment to attach to — the item is flagged rather than guessed. An unresolved item is reported to your team for a manual read, not silently dropped or estimated with a default.

Next step

Run a pilot on a structural steel set.

Bring one drawing set and the estimate you already have. We measure it, you compare it line by line.

Call PiloBuild+1 (872) 804-7023