HomeWho we serveTradesDrywall

Trade · Drywall & Metal Framing · CSI Division 09

Board footage and stud counts that already know the fire rating.

Drywall takeoff runs on square footage of board by layer and fire rating, linear footage of stud and track by gauge, and a count of ceiling grid and accessories — and almost none of it is legible from the floor plan alone. The rating and layer count live in a wall-type schedule that has to be matched back to every wall segment.

Worker fastening drywall with a drillT-04 · Drywall

Photo: Master Sgt. Caycee Watson / U.S. Air National Guard. The appearance of U.S. Department of War (DoW) visual information does not imply or constitute DoW endorsement.

Drawing reading

The drawing-reading problem: the wall tag decides the layer count

A one-hour rated corridor wall and a standard partition can look identical on a floor plan — the same line weight, the same double line — and differ only in a wall-type tag that specifies layers of board, stud gauge and spacing, and whether the assembly is UL-listed. Reading the plan without resolving the tag produces a board and stud quantity for the wrong assembly on every rated wall in the building.

Ceiling plans add a second geometry problem: grid layout and soffit framing are drawn as reflected ceiling plan linework that has to be reconciled against the floor plan below it, since a soffit or bulkhead changes both the ceiling square footage and the framing linear footage in ways the floor plan alone will not show.

Objects + units

What gets measured, and in what unit

Six object classes cover a typical drywall package. Each keeps its own unit instead of being folded into a single blended quantity.

Takeoff objectUnitHow PiloBuild resolves it
Gypsum boardSF, by layer and type (regular, moisture, fire-rated)Wall and ceiling area from resolved geometry, board type and layer count from the wall-type tag.
Metal framingLF, by gauge and spacingStud, track and furring channel length from the wall run, gauge from the tag.
Fire-rated assembliesLF of wall, by UL design numberRated walls classified separately so rated and non-rated board and labor do not get averaged together.
Insulation & sound battsSF, by wall typeApplied only to wall types whose tag calls for acoustic or thermal batt.
Acoustic ceiling gridSF (field), LF (grid runners)Reflected ceiling plan geometry, reconciled against soffit and bulkhead framing.
AccessoriesLF (corner bead, control joint), EA (access panels)Located from plan detail callouts rather than estimated as a percentage of board area.
Resolution

Classification, resolved before the quantity is produced

Every wall segment is resolved to its wall-type tag before quantities are generated, so a one-hour rated wall and a standard partition — even when they are drawn identically — are classified separately and priced with the correct layer count, board type and stud gauge. Linear footage of top and bottom track comes from the same resolved wall run used for board area, so the two numbers stay consistent with each other by construction, not by a separate manual check.

Reflected ceiling plan geometry is read as its own vector layer and cross-referenced to the floor plan below, so soffits and bulkheads contribute their own SF and LF instead of being absorbed into a flat ceiling-area number.

Output

What you get back on a drywall package

Quantities by class

Every drywall object above, grouped the way your estimating desk already groups it, with the unit that matches how it is bought.

A geometry audit trail

Each quantity links back to the sheet, the resolved callout or schedule row, and the scale a person confirmed.

A BOM cross-check

Design-intent drawings compared against a subcontractor shop-drawing takeoff on the same scope, with discrepancies listed before they reach the field.

Review

3 questions, specific to drywall

What CSI division does Drywall takeoff fall under?

Primarily CSI Division 09 (Finishes). Related sections we classify against on a typical drywall package include: 09 21 00 Plaster and Gypsum Board Assemblies, 09 22 16 Non-Structural Metal Framing, 09 51 00 Acoustical Ceilings.

Does PiloBuild replace our estimator on this trade?

No. PiloBuild produces the measured quantities, grouped and classified the way this page describes, and a bid summary showing the arithmetic behind the cost build-up. Your estimator applies judgment, reviews the classification, and owns the number that goes on the bid. The scale confirmation and the review-and-approve gate exist specifically so a person checks the machine, not the other way around.

What happens when the drawing set is incomplete or the schedule is missing?

Where a callout cannot be resolved — a wall-type tag that does not match any schedule row, a size annotation with no nearby segment to attach to — the item is flagged rather than guessed. An unresolved item is reported to your team for a manual read, not silently dropped or estimated with a default.

Next step

Run a pilot on a drywall set.

Bring one drawing set and the estimate you already have. We measure it, you compare it line by line.

Call PiloBuild+1 (872) 804-7023